What is the relationship between ship tonnage and ship performance?

The larger the tonnage of the ship, the more various things it can carry. If it is a warship, it means that it has strong firepower and strong continuous combat capability. Displacement is a sign of the size of a surface ship and is one of the tactical and technical performance elements. The displacement of surface ships is divided into no-load displacement, standard displacement, normal displacement, full-load displacement and maximum displacement. No-load displacement: refers to the weight of the ship after the completion of construction and the installation of various devices and equipment, excluding the weight of personnel, luggage, food, liquid, load, ammunition, supplies, fuel, lubricating oil, water supply, aviation fuel, etc. Standard displacement: refers to the ship's no-load displacement plus the rated personnel, luggage, food, liquid, load, ammunition, supplies, etc. Normal displacement: The standard displacement of a ship plus the fuel, lubricating oil, water supply, aviation kerosene and 100 percent of the loading weight required to ensure 50 percent of the endurance and self-sufficiency is often used as the displacement for ship design and formal trial. Full-load displacement: refers to the ship's standard displacement plus the fuel, lubricating oil, water, aviation kerosene, and 100 percent loaded weight required to ensure 100 percent of the endurance and self-supply. Maximum displacement: refers to the ship's full-load displacement plus the weight of fuel oil, lubricating oil, water supply, ammunition, etc.

13

2023

/

12

Modern Crafts of Shipbuilding

Hull lofting Linear lofting: manual lofting and machine (computer) lofting, manual lofting is generally 1:1 ratio, the sample table takes up a large area, requires more manpower and material resources, and is less used; Machine lofting is also called mathematical lofting. It relies on advanced technical software to lofting the hull. The mathematical lofting has high accuracy and does not occupy space and manpower. Machine lofting is widely used. Structure lofting and unfolding: lofting and unfolding of each structure, drawing the corresponding processing template and sample bar. Billing Sketch: Sketch the corresponding blanking. steel pretreatment Pretreatment of steel surface to eliminate stress. Steel correction: generally for mechanical methods, that is, the use of multi-roll straightening machine, hydraulic press, steel straightening machine, etc. Surface cleaning: a. Mechanical derusting method, such as shot blasting derusting method shot blasting derusting method, more widely used; B. Pickling rust removal method, also known as chemical rust removal, the use of chemical reactions; C. manual rust removal method, with hammer and other tools to knock rust component processing Edge processing: shearing, cutting, etc; Cold and hot processing: eliminate stress, deformation, etc; Molding processing: oil press, cold bending machine, etc. Hull Assembly Hull (parts) assembly, the various components of the combination of splicing into a variety of space we need shape. hull welding The shape of the assembled space is welded to become a permanent integral whole. tightness test All kinds of tightness test, such as coloring test, ultrasonic, X, etc. ship launching After the basic formation, all the volume below the design line is the immersion volume. Gravity launching: the general method is launching from the ship's platform, which is launched by the ship's own weight and sliding speed; Buoyancy launching: generally in the form of a dock; Machine launching: suitable for small and medium-sized ships, towed or hoisted by machinery and equipment. Ship Outfitting Ship outfitting to carry out a comprehensive outfitting system, mooring system, machine fitting, electrical equipment, pipe fitting and other aspects of the work. ship test Ship test berthing test, tilt test, trial (comprehensive test of the ship's performance).

13

2023

/

12

What are the main aspects of the daily maintenance of the ship?

After a long sea voyage, the ship will be towed into the dock for maintenance. The most contaminated part is the bottom of the ship. According to different sea conditions and the influence of ocean currents, the bottom of the ship will attach a variety of microorganisms, so regular maintenance is required. What should ship maintenance know? 1. What is the purpose of maintenance? The purpose of ship paint maintenance is to extend the service life of the ship's internal, external and various equipment, and to minimize the adhesion of marine organisms on the bottom of the ship to reduce the ship's navigation resistance. Therefore, the ship should develop and fully implement a long-term, preventive maintenance plan, which includes regular flushing, repainting and other maintenance measures. What are the requirements for ship paint? Ship paint generally requires good decoration, weather resistance, anti-corrosion, sun protection, anti-rust, anti-corrosion, anti-fouling, wear resistance, cold resistance and other properties. 3. What are the weather requirements for ship painting construction? The basic requirements for ship painting construction are: clear weather, no wind, no pollution, and humidity in the air within 90%. 4. How should the surface of the ship be treated? (1) When the shipyard is docked for repair, the salt on the hull shall be washed off with high-pressure fresh water, and then the rust skin and the floating paint skin shall be knocked off by sand blasting method (or shot blasting method, commonly known as "sand beating"). Only after the ship's acceptance can the surface of the hull be painted. (2) In places that cannot be sandblasted or are not worthy of sandblasting (small area), derusting can be carried out by tapping shovel or grinding. The tapping shovel can be operated by derusting hammer, blade brush, wire brush and other tools, while mechanical grinding usually uses pneumatic tools, such as pneumatic hammer, grinding wheel and rotating metal parts, etc. to remove rust on the surface of components. After derusting, compressed air should be used to blow the surface dust and rinse with fresh water. (3) For two-component paint, attention should be paid to its blending ratio, curing time and pot life, and the specific operation should be carried out in accordance with the instructions.

13

2023

/

12

Copyright©Fujian Lixin Ship Engineering Co., Ltd.

Zhizhao